Council demolition requirements

Demolishing a house in the Ku-ring-gai Council area

What Ku-ring-gai Council publishes about demolition approvals, heritage, trees and site conditions, read from its own pages on 21 September 2026. The council or certifier confirms the pathway for your address.

1300 329 600

Covers 16 suburbs we service across the North Shore.

How the council handles demolition approvals

Ku-ring-gai Council requires a DA where work isn’t exempt or complying, usually with a Waste Management Plan, plus a Bushfire Risk Assessment Certificate on bushfire prone land. The infrastructure bond must be paid before any demolition starts.

Read the council’s approvals page

Heritage items and conservation areas

Heritage conservation areas protect whole areas from inappropriate development. A section 10.7 planning certificate or the council’s online map confirms whether a property is in one, and the council lists the areas by suburb.

Conservation areas the council names: Mahratta Conservation Area, Heydon Avenue Warrawee Woodville Avenue Wahroonga Conservation Area, Wahroonga Conservation Area, Warrawee Conservation Area C3, Laurel Avenue King Street Conservation Area, Bobbin Head Road Conservation Area, Hillview Conservation Area, Ku-ring-gai Avenue Conservation Area.

Read the council’s heritage page

Trees on the block

Ku-ring-gai treats a plant 5 metres or taller, or with a trunk 150 mm or wider at ground level, as a tree. Work on non-exempt trees needs an application, including every tree on a heritage property or in a conservation area, and dead trees aren’t automatically exempt.

Read the council’s trees page

Flood and bushfire mapping

Most vegetated areas of Ku-ring-gai, and land within a set distance of them, are bushfire prone, and development there must meet Planning for Bushfire Protection 2019 and AS 3959-2018. The map can be checked online, through the RFS tool or on a section 10.7 certificate.

Read the council’s flood and bushfire page

Fees, bonds and public land

An infrastructure damage bond and inspection fee apply to DAs over $10,000 and CDCs over $25,000, payable before any demolition starts. The bond is released after a final inspection if there’s no damage, or held six months for developments of more than two dwellings.

Read the council’s fees and public land page

Council pages change. Treat this as a starting point and confirm requirements with Ku-ring-gai Council or your certifier before setting a demolition date. Ku-ring-gai Council website

The same across NSW

What applies in every council area

Council requirements sit on top of state rules that do not change from one area to the next.

  1. Approval pathway

    Most house demolition needs either a development application to the council or a complying development certificate from the council or a registered certifier under the state Demolition Code. Heritage items and conservation areas are generally excluded from the complying pathway.

    Read the approvals guide
  2. Licensed demolition

    Demolition work is licensed by SafeWork NSW. Gabrael holds restricted demolition licence AD202697 (DE2) and lodges the required notifications for the work it carries out.

    How to check a contractor
  3. Asbestos

    Suspected asbestos must be assessed before the building is disturbed. Our Class B licence AD211249 covers bonded, non-friable material; friable asbestos is removed by our Class A licensed partner.

    Asbestos before demolition
  4. Utilities

    Water, sewer, electricity, gas and telecommunications are disconnected or abolished through the providers before demolition, and Before You Dig Australia is checked for services.

    Utility disconnections guide
  5. Neighbours

    Approval conditions commonly set working hours and neighbour notice, and a dilapidation report protects both sides where buildings sit close to the boundary.

    Neighbours and notice
  6. Waste

    Concrete, timber and metals are sorted for licensed recycling and asbestos goes to an approved disposal facility with documentation. Some councils ask for a waste plan with the application.

    Where the waste goes

Suburbs we service in this council area

Suburbs that sit across a council boundary appear under each council. We confirm the council for the exact address before preparing an application.

All council areasAll service areas

Start with your property

Planning a demolition in the Ku-ring-gai Council area?

Send the property address and what needs to go. We check the council, planning controls and heritage status for the address, then arrange a free site assessment.

1300 329 600

7am to 7pm, seven days.

Call 1300 329 600